|
No action is necessary, unless a majority of the Board
wishes to consider this preliminary subdivision
application. On January 26, 2006, the Planning Commission
voted to approve the Groveton Meadow Preliminary Plan
subject to the conditions noted below:
- The
Final Plat shall be in general conformance with the
Preliminary Plat entitled “Groveton Meadow” dated
February 1, 2005, last revised January 17, 2006 and
received in the Planning Office on January 18, 2006,
except as modified by these conditions. This approval
is for a maximum of forty-two (42) single-family
attached residential lots.
2.
Prior to final subdivision approval, evidence that
offsite easements for water and sanitary sewer lines have
been obtained shall be provided.
3.
An overlot grading plan that shows downspout
locations shall be provided as part of the Final
Construction Plans.
4.
Proof of provisions for adequate fire flow shall be
required with the first submission of the Final Construction
Plans.
5.
To assure constructability, the horizontal design of
the interparcel connector (to the west) shall be provided
with the final construction plans. The design shall show
that the connector can be built in the next property. (N/R
Embrey)
6.
This project shall meet the requirements of the
County Design Facilities Manual adopted on October 13, 2005.
7.
The proposed trail shall be constructed by the
applicant at the time of all Route 55 (East Main Street)
right-of-way improvements as reflected in the Preliminary
Plat.
8.
Any utilities that are installed within an existing
and/or proposed state maintained road shall be in
conformance with VDOT standards.
9.
The applicant agrees they shall conform to the
architectural drawings included in the Preliminary Plat.
|