Shadow Lawn Minimal Repairs
1. Replace existing standing seam metal roof: $12,120. 2. Remove Lead paint materials allowance includes disposal: $4,000. 3. Remove asbestos allowance includes disposal: $8,500. 4. Masonry: Point, patch and clean stone foundation wall, point and patch chimney, new foundation walls, scaffolding: $8,429. 5. ADA compliant railing system: $4,800. 6. Replace gutters and downspouts cooper: $4,480. 7. Exterior caulking and sealant allowance: $2,500 8. New VCT tile and base allowance at wet areas: $648. 9. Paint interior of existing building: $4,832. 10. Paint exterior of building: $13,552. 11. Replace boiler: $2,250. 12. Replace front porch: $3,889. 13. G.C. overhead conditions: $10,500. 14. Contingency/Inflation Adjustment: $10,500
Sub Total: $91,000
Parks and Recreation Minimal Repairs1. Replace existing standing seam metal roof: $15,360. 2. Remove Lead paint material allowance includes disposal: $3,000. 3. Remove asbestos allowance includes disposal: $3,500. 4. Masonry: point, patch and clean stone foundation. Point and patch chimney. Scaffolding: $4,215. 5. ADA compliant railing: $4,000. 6. Exterior caulking and sealant allowance: $2,000. 7. New VCT at wet areas: $648 8. Paint interior of existing building: $3,488. 9. Paint Exterior of existing building-: $8,870. 10. Refurbish exterior doors and new ADA hardware -: $1,128. 11. Replace gutter and downspouts cooper: $2,304. 12. Insulation of existing attic: $1,853. 13. G.C. overhead/conditions: $7,500. 14. Contingency/Inflation Adjustment: $7,134. Sub Total: $65,000 Property Acreage: 1.2824
Grand Total: $156,000
|