Priority
|
Magisterial
District
|
Route
|
UPC
|
Route Name
|
Description of Work
|
|
0 |
Cedar Run |
748 |
56092 |
Eskridges
Lane |
Reconstruct
and Surface Treat from Rt. 806 to end of State Maintenance
|
|
0 |
Cedar Run |
806 |
18168 |
Elk Run
Road
|
Improve curves at
two locations 0.625 Mi. south Rt. 640 to 0.144 Mi. North of Rt.
640 |
|
0 |
Lee |
1201 |
58118 |
Lucky Hill
Road |
Reconstruct
and Surface Treat from Rt. 651 to Rt. 655 |
|
0 |
Center/Scott |
605 |
76193 |
Dumfries
Road |
Intersection Improvements, Spot Improvements from Rt. 674 to Rt.
676 |
|
0 |
Marshall |
800 |
87925 |
Old Culpeper Road |
Reconstruct
and Surface Treat for Rt. 29 to end of State Maintenance
|
|
1
|
Center/Scott
|
605
|
11216
|
Dumfries
Road
|
Turn Lanes
at Rt. 674 and Rt. 1401
|
|
2
|
Center/Scott
|
605
|
11217
|
Dumfries
Road
|
Turn Lanes
and Drainage Structure 0.294 Mi. East Rt. 674 to 0.656 Mi. East
Rt. 674 |
|
3 |
Lee |
655 |
58123 |
Tinpot Run
Road |
Bridge
Replacement and Approaches over Tinpot Run |
|
4 |
Lee
|
655 |
T7508 |
Tinpot Run
Road/Luck Hill Road |
Improve
curve at Intersection Route 1201 and Route 655 |
|
5 |
Lee |
651 |
11153 |
Sumerduck
Road |
Bridge and
Approaches over Sumerduck Run
|
|
6 |
Lee |
615 |
87929 |
Silver Hill
Road |
Reconstruct
and Surface Treat from Rt. 651 to 0.3 Mi. North Rt. |
|
7 |
Cedar Run |
794 |
52240 |
Heddings
Road |
Reconstruct
and Surface Treat from Rt. 611 to end of State Maintenance |
|
8 |
Marshall |
688 |
82327 |
Leeds Manor
Road |
Two Bridge
Replacements and Approaches over Thumb Run and Tributary |
|
9 |
Scott |
600 |
71965 |
Broad Run
Church Road |
Upgrade
Road from Rt. 29 to Rt. 676
|
|
10 |
Cedar Run |
692 |
87928 |
Kines Road |
Reconstruct
and Surface Treat from Rt. 670 to End of State Maintenance |
Note: “0” priority projects have been completed
and/or are to be removed from the current SSYP