1.
The Final Plat shall be in
general conformance with the Preliminary Plat entitled
“Stonehill Estates” dated August 2, 2005 and received in
this office March 15, 2006. This approval is for a maximum
of four (4) single-family residential lots and a cul-de-sac
length waiver.
2.
The applicant agrees to deed
restrict the four lots created with the Final Plat from
further subdivision.
3.
All applicable State and
Federal permits, including the COE wetlands permit, shall be
submitted with the first submission of Final Construction
Plans.
4.
The
County recommends that no below grade basements be
constructed on soils with high water table due to wetness
unless the foundation drainage system of the structure is
designed by licensed professional engineer to assure a dry
basement and preclude wet yards and recirculation of pumped
or collected water. Unless, in the opinion of the County
Engineer, the topography of the lot in relation to the
overlot-grading plan precludes grading the site to drain the
basement to daylight, all basements shall be designed to
gravity daylight without assistance from mechanical means.
All discharged water (mechanical or gravity) must be
conveyed to an adequate channel. Drainage easements, where
necessary, shall be placed on
the final plat. A note that “Basements are not recommended
in mapping units 2A, 12A and 16B. Basements in these mapping
units are subject to flooding due to high seasonal water
tables. Sump systems may run continuously, leading to
possible premature pump failure.”
5.
Houses shall not be located in
swales.
6.
Approval of the Special
Exception for fill in the floodplain shall be required prior
to submission of the Final Construction Plans.
7.
The applicant shall provide
corrected density calculations on the Final Construction
Plans; a lot shall be eliminated if the calculations do not
demonstrate that four lots are achievable in the R-1 portion
of the site.
8.
The
revised floodplain shown on this Preliminary Plat is not
approved and may change. Prior to Final Construction Plan
approval, an approved CLOMR from FEMA shall be provided. If
the final boundary prevents any lot from meeting the 25-foot
setback requirement from the floodplain, that lot shall be
eliminated.
9.
In addition to the landscaping
required by the Fauquier County Zoning Ordinance, the
applicant agrees to plant an additional 25-foot buffer in
accord with the Landscape Schedule prepared by Bury
Partners, dated March 27, 2006, and made a part of this
file.
10.
The applicant agrees that all
houses shall contain a minimum of 2,500 square feet of above
grade, finished air conditioned space.
11.
The applicant has agreed they
shall make a voluntary donation of $2,920 to Fauquier County
Parks and Recreation prior to Final Plan approval.
12.
Verification from the Health
Department shall be provided prior to Final Construction
Plan approval that the wells on the site have been properly
abandoned.