The applicant is seeking Preliminary Plat approval to divide
one parcel of approximately ±11.50 acres into five (5)
single-family residential lots ranging in size from ±1.0 to
±2.553 acres. In addition, there is a SWM/BMP lot and an
administrative lot (under separate application). This
Village (V) zoned parcel has the gross subdivision potential
of approximately sixteen (16) lots. Each property will be
served by a private well and septic field. The Preliminary
Plat is included as Attachment 1.
Section 19-18 of the County Code requires a proposed
subdivision to connect to a public water system if located
within 300 feet of such system. The proposed subdivision is
approximately 504 feet from the Turnbull water system. The
Water and Sanitation Authority indicates that the existing
Turnbull water system has approximately four (4) taps left
on this system which would not suffice even if the
subdivision were located within the 300 feet. |
|
No action is necessary, unless a majority of the Board wishes to
consider this preliminary subdivision application. On April
27, 2006, the Planning Commission voted to approve the
Greenwich Woods Preliminary Plat, subject to the following
conditions:
- The
Final Plat shall be in general conformance with the
Preliminary Plat entitled “Richards Turnbull Estates”
dated August 16, 2005, last revised March 27, 2006 and
received in this office April 7, 2006. This
approval is for a maximum of five (5) single-family
residential lots.
- Houses
and drainfields shall not be located in swales. The
house pad and drainfield on Lot 3 shall be moved outside
the swale.
- All
intersections shall meet the County intersection landing
requirement IL-1.
- This
site is located on soils that are characterized by
shallow rock and as such blasting may be required.
Prior to any blasting, the Office of Emergency Services
shall be contacted and any applicable permits must be
obtained.
- An
overlot grading plan shall be provided as part of the
Final Construction Plans.
- All
existing utilities shall be shown on the Final
Construction Plans.
7.
The Final Construction Plan shall address Preliminary
Plan Checklist Geometrics item 10 regarding the centerline
distance, curve data, etc.
|