CONSENT AGENDA REQUEST

Owner/Applicant:                                                                 Board of Supervisors Meeting Date:

Joseph L. and Donetta J. Perkins                                                                   June 23, 2003

Staff Lead:                                                                                                    Department:

Chuck Floyd                                                                                 Community Development        

Magisterial District:                                                                                             PIN:

Cedar Run                                                                                                 7836-89-5535-000

Topic:

Consider Preliminary Subdivision Application (#PP03-CR-27) - Perkins Subdivision

Topic Description:

The applicant is seeking Preliminary Plat approval to divide approximately 40.6 acres into three (3) single-family residential lots. The subject property is zoned Rural Agriculture (RA), and is located on the west side of State Route 616 (Bristersburg Road) south of its intersection with State Route 617 (Blackwells Mill Road).  

Section 9-7 of the Subdivision Ordinance requires that "…all preliminary plats approved by the Planning Commission shall be referred to the Board of Supervisors at its next regularly scheduled meeting…If the Board takes no action on the preliminary plat referral, the preliminary plat shall be deemed approved in accordance with the actions of the Planning Commission."

The Planning Commission staff reports are available upon request.

Requested Action of the Board of Supervisors:

No action is necessary, unless a majority of the Board wishes to consider this preliminary subdivision application.  On May 29, 2003 , the Planning Commission voted to approve the Perkins Preliminary Plat subject to the conditions noted below:

  1. The final plat shall be in general conformance with the Preliminary Subdivision Plat entitled "Perkins Subdivision" dated November 15, 2002 , and received in the Planning Office on April 17, 2003 ; however, the following items need to be addressed prior to the Board of Supervisors Action:

                                      

A.     In accordance with Section 3-400.12 of the Fauquier County Zoning Ordinance, front building restriction lines are measured (and shall be noted on the Preliminary Plat) from the centerline of the roadway, not the property line.

B.     The bulk regulations for the appropriate zoning district shall be listed on the plan.

C.     Lots 4 and 5 shall meet the minimum lot width requirements for RA zoning; please note on the plan if this is a cluster development and provide the accurate bulk regulations for such.

D.     The Preliminary Plat shall include the width of the right-of-way on Route 616 from either the centerline of the road or the edge of pavement to the property line.

E.      The Preliminary Plat shall indicate the distance to the nearest intersection

2.      In accordance with Section 7-603.2 of the Fauquier County Zoning Ordinance, Residential Subdivisions, a landscape plan shall be required prior to approval of the Construction Plans.

3.      All existing culverts are to be shown.  All driveway culverts are to be sized for the 10-year storm.

  1. The natural drainage swales are to be protected to the maximum extent possible.  All houses are to be located above the 10-year water surface elevation in the drainage swales.
  2. A Virginia Certified Professional Soil Scientist (CPSS) needs to adjust the preliminary soil map with revisions onto the final construction plan.  This needs to be done in the field and checked for any additional soils information to be added to the final construction plan.
  3. Interpretive information from the Type I soil report for each mapping unit shown on the above final construction plan shall be placed on the same sheet as the soil map.  Also a Symbols Legend shall be placed on the final construction plan to identify spot symbols.
  4. The statements under Home Sites and Road Construction shall be placed on the same sheet as the final soils map.

8.      Signature block shall be placed on this plat for the CPSS to sign which states:

Preliminary Soils Information Provided by the Fauquier County Soil Scientist Office via a Type I Soil Map (1"=400') Dated November 19, 2002 .

This Virginia Certified Professional Soil Scientist has field reviewed and adjusted the preliminary soil information onto the final plat (1"=???') and certifies that this is the Best Available Soils Information to Date for Lots 4 and 5.

                                                                                                                                   

Va. Certified Professional Soil Scientist                         DATE

CPSS #3401-             

Attachment:

Preliminary Plat