RESOLUTION A
RESOLUTION APPROVING SPEX04-CR-005: A
CATEGORY 23 SPECIAL EXCEPTION TO ALLOW FOR A TIMEFRAME EXTENSION FOR SIX
(6) MONTHS ON SE01-CR-10, SMITH-MIDLAND CORPORATION, OWNER/APPLICANT
WHEREAS, Smith-Midland Corporation, Owner/Applicant, is seeking a
time frame extension for six (6) months on a previously approved Special
Exception, SE01-CR-10; and
WHEREAS, condition three (3) of SE01-CR-10 stated that within
eighteen (18) months of approval date, the applicant shall remove the
existing low water crossing and replace it with a bridge structure that
spans Licking Run; and WHEREAS, the applicant is in the process of actively satisfying condition three (3) but the original eighteen (18) month time frame has expired; and
WHEREAS, on
RESOLVED by the Fauquier County Board of Supervisors this 20th
day of October 2003, That SPEX04-CR-005 be, and is hereby, approved
subject to the following conditions: 1.
Within six (6) months of the approval date of this extension, the
applicant shall remove the existing “low water crossing” and replace
it with a bridge structure that spans Licking Run.
The span shall be built in accordance with all applicable federal,
state, and local regulations to specifications approved by the 2.
The
extension shall only be granted once, for a period of six (6) months. |