A Traffic Impact Analysis of the New Baltimore Service District Plan

These chapters are in Adobe Acrobat Format. Click here to download free viewer

Table of Contents

 

Topic

Page

A. Introduction

 

1. Study Area and Purpose

3

2. Existing and Proposed Uses

6

3. Existing Roadways and Programmed Improvements

 

7

 

B. Analysis of Existing Conditions

 

1. Peak Hour Traffic Volumes

9

2. Capacity Analysis and Levels of Service

 

9

 

C. Trip Generation

 

10

 

D. Traffic Distribution and Traffic Assignments

 

10

 

E. Analysis of Buildout Conditions (2030)

 

1. Peak Hour Traffic Volumes (AM/PM)

11

2. Capacity Analysis & Levels of Service

11

3. Recommended Improvements Priority List

 

12

 

F. Conclusions

 

14

 

Figures

 

Figure 1: New Baltimore Service District Boundary

4

Figure 2: Intersections Analyzed

5

Figure 3: Lane Geometry and Levels of Service (Existing Conditions)

17

Figure 4: AM/PM Peak Hour Volumes (Existing Conditions)

18

Figure 5: Trip Distribution Patterns

19

Figure 6: AM/PM Peak Hour Volumes (Build-Out Conditions)

20

Figure 7: Lane Geometry and Levels of Service (2030 Build-Out Conditions)

 

21

 

Tables

 

Table 1: Levels of Service and Maximum Queue Lengths (Existing Conditions)

23

Table 2: Trip Generation Summary

24

Table 3: Levels of Service and Maximum Queue lengths (2030 Build-Out Conditions)

 

25

 

Appendix

 

1. Methodology for a New Baltimore Service District Build-Out

 

2. Level of Service Definitions

 

3. Existing Conditions Synchro Work Sheets

 

4. Build-Out (Year 2030) Conditions Synchro Work Sheets

 