FAUQUIER COUNTY DESIGN STANDARDS MANUAL
Adopted: October 13, 2005
Includes Revisions thru June 2009
TABLE OF CONTENTS
Articles are in Adobe Acrobat Format. Click here to download free viewer.
| Chapter 1 General Provisions | ||
SECTION |
PAGE | |
100 |
Purpose and Intent | GP-3 |
101 |
Referenced Documents | GP-3 |
102 |
Authority | GP-4 |
103 |
Applicability | GP-4 |
104 |
Administration | GP-5 |
105 |
Waivers | GP-6 |
106 |
Appeal of Decisions | GP-7 |
107 |
Public Protection | GP-7 |
108 |
Plan Required | GP-8 |
109 |
Disclaimer | GP-8 |
| Chapter 1 General Provisions Appendix | ||
SECTION |
PAGE | |
A108 |
Major Site Plan Checklist | GP-10 |
A108 |
Construction Plan Checklist | GP-16 |
A108 |
Final Plat Checklist | GP-22 |
| Chapter 2 Drainage Chapter | ||
SECTION |
PAGE | |
200 |
Introduction | D-3 |
201 |
General Provisions | D-3 |
202 |
Definitions | D-8 |
203 |
Stormwater Management Program Permit Procedures and Req. | D-13 |
204 |
General Criteria for Stormwater Management | D-19 |
205 |
Construction Inspection | D-20 |
206 |
Maintenance Inspection and Repair of Stormwater Facilities | D-21 |
207 |
Enforcement and Penalties | D-21 |
208 |
Erosion and Sediment Control Requirements | D-22 |
| Chapter 2 Drainage Appendix | ||
SECTION |
PAGE | |
| A201.8 | General Drainage Requirements | D-34 |
| A201.8.1.B | Stream Channel Erosion | D-36 |
| A201.8.10 | Maintenance and Access Easements | D-36 |
| A203.2.2.C | Stormwater Management Plan Calculations | D-37 |
| A204.1 | General | D-51 |
| A208.7(e) | Administrative Policy for Early Grading | D-62 |
| Chapter 3 Transportation | ||
SECTION |
PAGE | |
300 |
Purpose and Intent | T-3 |
301 |
Transportation Planning | T-3 |
301.A |
General Requirements | T-3 |
SECTION |
PAGE | |
301.B |
Traffic Impact Analysis and Study | T-3 |
301.B.1 |
Traffic Impact Analysis Requirements | T-4 |
301.B.2 |
Traffic Assessment for Projects Not Requiring a Traffic Impact Analysis | T-7 |
| Chapter 3 Transportation Appendix | ||
SECTION |
PAGE | |
A301.B. |
When a Traffic Impact Analysis is Required | T-10 |
A301.B.1.e |
Traffic Impact Analysis Study Contents | T-14 |
| Chapter 4 ( Reserved for Future Use) | ||
| Chapter 5 ( Reserved for Future Use) | ||
| Chapter 6 ( Reserved for Future Use) | ||
| Chapter 7 ( Reserved for Future Use) | ||
| Chapter 8 Performance Guarantee | ||
SECTION |
PAGE | |
800 |
Purpose and Intent | PG-3 |
801 |
Performance Guarantee Requirements | PG-3 |
802 |
Types of Surety | PG-4 |
803 |
Performance Guarantee Process and Procedures | PG-4 |
804 |
Street Acceptance Procedure | PG-8 |
805 |
Unit Price List | PG-10 |
| Chapter 8 Performance Guarantee Appendix | ||
SECTION |
PAGE | |
A801 |
Performance Guarantee Requirements | PG-12 |
A803 |
Performance Guarantee Estimates and Documents | PG-14 |
A804 |
Submission Requirements | PG-46 |
A805 |
Unit Price List | PG-53 |
| Chapter 9 (Reserved for Future Use) | ||
| Chapter 10 (Reserved for Future Use) | ||
Date Last Modified: 07/01/2009



