A Traffic Impact Analysis of the New Baltimore Service District Plan
These chapters are in Adobe Acrobat Format. Click here to download free viewer
|
|
|
Topic | Page |
|---|---|
A. Introduction |
|
1. Study Area and Purpose | 3 |
2. Existing and Proposed Uses | 6 |
3. Existing Roadways and Programmed Improvements
| 7
|
|
|
1. Peak Hour Traffic Volumes | 9 |
2. Capacity Analysis and Levels of Service
| 9
|
|
| 10
|
D. Traffic Distribution and Traffic Assignments
| 10
|
|
|
1. Peak Hour Traffic Volumes (AM/PM) | 11 |
2. Capacity Analysis & Levels of Service | 11 |
3. Recommended Improvements Priority List
| 12
|
F. Conclusions
| 14
|
Figures |
|
4 |
|
5 |
|
Figure 3: Lane Geometry and Levels of Service (Existing Conditions) | 17 |
18 |
19 |
20 |
|
Figure 7: Lane Geometry and Levels of Service (2030 Build-Out Conditions)
| 21
|
|
|
|
Table 1: Levels of Service and Maximum Queue Lengths (Existing Conditions) | 23 |
Table 2: Trip Generation Summary | 24 |
Table 3: Levels of Service and Maximum Queue lengths (2030 Build-Out Conditions)
| 25
|
Appendix |
|
1. Methodology for a New Baltimore Service District Build-Out |
|
|
|
|
|
|
|
|
|
Date Last Modified: 02/23/2010