A Zoning Permit is required, unless the structure is less than 256 square feet in size. While structures less than 256 feet in area do not require a permit, they must still meet all zoning setback requirements from property lines and floodplains. Disturbance related to creating fields or pastures for agricultural use do not require a zoning permit. A Land Disturbing Permit may also be required, depending on the extent of land disturbance occurring. Disturbance related to creating fields or pastures for agricultural use are exempt, but disturbance related to construction of driveways, ponds and buildings is not exempt. Incomplete applications cannot be processed and will be returned. A qualifying ‘farm building or structure’ does not require a Building Permit and is exempt from all Building Code and building inspection requirements unless:
Garages, sheds, pools and other structures accessory to the dwellings on a farm property are also not exempt. To qualify as a "Farm Building or Structure," the building must be located on a property where farming operations currently take place and must be utilized primarily for the uses listed below:
Applying for a Farm Building/Structure Permit 1. Zoning Permit application must be completed. 2. Adding bathrooms in an agricultural building will require a construction permit from the Health Departmentoffice. 3. Farm Building/Structure Affidavit. This Affidavit must be notarized; a Notary is available at the Permitting Counter for this form, free of charge. 5. Land Disturbing Application Less than 1 acre (if required) or Land Disturbing Application More than 1 acre (if required) or In Lieu of Agreement - Farm Building or Structure (if required and meets criteria) 6. Floor plan- Labeled and including structure dimensions and Elevation view of the building. 6. 2 copies of a plat showing the proposed structure drawn to scale with the setbacks clearly marked. Private well and septic - indicate location of those components on the plat. 7. VDOT entrance permit is required if it's the first structure on the property. 8. USB thumb/flash drive with all forms and plans preloaded. 9. $110.00 Zoning fee. Fees are payable by exact cash, credit card or check – starter checks will NOT be accepted. Credit cards accepted are Visa, MasterCard & Discover and will only be accepted in person. A convenience fee will be added to all credit card transactions. |