Design Standards Manual

Print
Press Enter to show all options, press Tab go to next option

Adopted: October 13, 2005
Includes Revisions thru January 10, 2019

Table of Contents

Chapter 1 - General Provisions
SECTION
PAGE
100 Purpose and Intent GP-3
101 Referenced Documents GP-3
102 Authority GP-4
103 Applicability GP-4
104 Administration GP-5
105 Waivers GP-6
106 Appeal of Decisions GP-7
107 Public Protection GP-7
108 Plan Required GP-8
109 Disclaimer GP-8
Chapter 1 - General Provisions Appendix

Access to Checklists GP-9
Chapter 2 - Drainage Chapter
SECTION
PAGE
200 General Provisions PG-4
201 Stormwater Hydrology PG-18
202 Open Channels PG-23
203 Culverts PG-25
204 Storm Drains PG-27
205 Stormwater Management PG-28
206 Energy Dissipation PG-31
207 Stormwater Pollutant Removal Practices PG-31
208 Stormwater Hotspots PG-33
209 Easements PG-34
210 Maintenance of Stormwater Management Facilities PG-36
211 Inspection and Enforcement PG-37
212 Erosion and Sediment Control Planning and Design PG-41
213 Exceptions PG-42

Exhibits PG-43
Chapter 3 - Transportation
SECTION
PAGE
300 Purpose and Intent T-3
301 Transportation Planning T-3
303 Entrances and Driveways T-8
304 Off-Street Parking and Loading Areas T-9
305 Road Acceptance Procedures T-13
307 Street Names and Addresses T-13
308 Signs T-13
310  Traffic Lights T-14

Chapter 3 - Transportation Appendix
SECTION
PAGE
A301.B.1.a When a Traffic Impact Analysis is Required T-16
A301.B.1.e Traffic Impact Analysis Study Contents T-21
A303.1.c Intersection Landing Requirements T-22
A304 Off-Street Parking and Loading Areas T-23
A304.5.f Backing or Reversing Area for Parking Lots T-24
A304.7 Parking Lot Pedestrian Circulation T-25
A308.1 Future Street Extension Signs T-26
A308.3.b Street Signs T-2
Chapter 4 ( Reserved for Future Use)
Chapter 5 ( Reserved for Future Use)
Chapter 6 ( Reserved for Future Use)
Chapter 7 ( Reserved for Future Use)
Chapter 8 - Performance Guarantee
SECTION
PAGE
800 Purpose and Intent PG-3
801 Performance Guarantee Requirements PG-3
802 Types of Surety PG-4
803 Performance Guarantee Process and Procedures PG-4
804 Street Acceptance Procedure PG-8
805 Unit Price List PG-10
 A801  Performance Guarantee Requirements  PG-12
A803   Performance Guarantee Estimates and Documents  PG-14
 A804  Submission Requirements  PG-46
 A805  Unit Price List  PG-53
Chapter 9 (Reserved for Future Use)
Chapter 10 (Reserved for Future Use)

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer